top of page
Flagship projects
Gas Plant Kazakhastan (2013-2015)
3D Laserscanning of the entire plant, modeling in PDMS and optimazation of the existing process (aprox. 12.000 hours).
FPSO Nigeria (2011-2019)
3D Laserscanning, modification of different areas and units with manufacturing control (aprox. 6.000 hours).
Drilling Rig USA/Nigeria (2016-2017)
As-built documentation, modification and revamp, preparation of all drawings, isometrics for the certification by the approval agency of Nigeria (aprox. 3.500 hours).
Clients
bottom of page