top of page
Flagship projects

Gas Plant Kazakhastan (2013-2015)

3D Laserscanning of the entire plant, modeling in PDMS and optimazation of the existing process (aprox. 12.000 hours).

KAZAK.jpg

FPSO Nigeria (2011-2019)

3D Laserscanning, modification of different areas and units with manufacturing control (aprox. 6.000 hours). 

BONGA.jpg

Drilling Rig USA/Nigeria (2016-2017)

As-built documentation, modification and revamp, preparation of all drawings, isometrics for the certification by the approval agency of Nigeria (aprox. 3.500 hours).

Hosuton2.png
houston1.png
Clients
bottom of page